Aparthotel Giewont II in Zakopane

SCOPE:
Building permit design / Executive design

PARAMETERS:
Total area: 4750 m2

DESIGN PERIOD:
Building permit design: October 2016 / Executive design: November – December 2018

ARCHITECTURE:
Karpiel Steindel Architektura

Building with a basement, a ground floor, a first floor, and a usable attic. Foundations in the form of a 35-centimeter thick reinforced concrete foundation slab, with local thickenings under reinforced concrete columns. Reinforced concrete slabs over the residential part 20 centimeters thick. The load-bearing system of the attic structure consists of reinforced concrete columns, beams, and walls, as well as masonry walls. Steel roof structure made of HEA sections and an HEB beam in the gable wall. Timber rafter roof truss.

We look forward to working with you